Commencement notice group

Commercial commencement notices — Santry

Santry, Dublin 17, Dublin

1 separate notice · latest notified commencement 10 Jun 2026 · planning basis not stated

Source notices
1
Latest notified commencement
10 Jun 2026
Latest notice
609 m²
Planning references supplied
None stated
Public location
Santry, Dublin 17, Dublin

Public source geography

Site location

Public site / locality
Santry, Dublin 17, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0143476FL BCMS open-data feed

The project will involve the removal and disposal of existing materials as well as supply and installation within an existing building for commercial office use. The scope of work for this project includes the partial strip out of the existing ceiling finishes, partitions, joinery and material finishes. The project will also involve the installation of new floorcoverings, and the installation of new LED lighting fixtures to augment existing with basic making good and decorations.

609 m² · stated on this notice

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.