Site start

Building extension site start — Dublin

Dublin

1 commencement notice · start date 29 Sep 2026 · planning reference given

Planning D25B/0331/WEB · Planning application

Commencement notices
1
Latest start date
29 Sep 2026
Latest notice
1 unit
Planning reference
D25B/0331/WEB
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Single-storey flat roof extensions to the front, side and rear, including relocation of the front door; partial demolition of the existing single storey rear extension; attic conversion to provide storage and an additional bedroom, including a side dormer to the north-facing roof slope; and new floor-to-gable glazing to the front elevation.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 40 m².

Planning reference D25B/0331/WEB

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.