Site start
Housing site start — Bandon
Bandon, Cork
5 commencement notices · latest start date 05 Oct 2023 · planning reference given
Planning 22/4960 · Planning application
- Commencement notices
- 5
- Latest start date
- 05 Oct 2023
- Latest notice
- 4 units
- Planning reference
- 22/04960
- Location
- Bandon, Cork
Location
Where the site is
- Area
- Bandon, Cork
- County
- Cork
Addresses on the notices
- Laurel Drive, The Tannery, Coolfadda, Bandon, Co
- Allmans View, Bandon
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Block 6 Laurel Drive, The Tannery: Construction 1 No. Apartment Block (No's 21,22,23 & 24) and all associated site services at Laurel Drive, The Tannery, Coolfadda, Bandon, Co. Cork
Floor area stated for this source: 332 m².
Block 5 Laurel Drive, The Tannery: Construction 1 No. Apartment Block (No's 17,18,19 & 20) and all associated site services at Laurel Drive, The Tannery, Coolfadda, Bandon, Co. Cork
Floor area stated for this source: 332 m².
Block 3 Laurel Drive, The Tannery: Construction 1 No. Apartment Block (No's 9,10,11 & 12) and all associated site services at Laurel Drive, The Tannery, Coolfadda, Bandon, Co. Cork
Floor area stated for this source: 332 m².
Block 4 Laurel Drive, The Tannery: Construction 1 No. Apartment Block (No's 13,14,15 & 16) and all associated site services at Laurel Drive, The Tannery, Coolfadda, Bandon, Co. Cork
Floor area stated for this source: 319 m².
Construction of 40no. dwellings (no.1-40) and all associated site services at Allmans View, Bandon
Floor area stated for this source: 6,000 m².
Source unit value with scope not stated: 40 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.