Site start

Building extension site start — Dublin

Dublin

1 commencement notice · start date 27 Feb 2025 · planning reference given

Planning SD24B/0317W · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
27 Feb 2025
Latest notice
218 m²
Planning reference
SD24B/0317W
Location
Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • ground floor to rear / side and at first floor landing to side
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD24B/0317W. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The proposed development for permission will consist of: •Demolition of existing single storey extension / garage to rear, part of main roof and chimney to side; •Construction of a single storey extension to the front and side including covered porch area to front; •Construction of a part single part two storey extension to the rear with rooflight; •New rooflight to side of main roof; •Alterations to existing windows / doors and/or new openings at ground floor to rear / side and at first floor landing to side; •All associated demolition, internal layout alterations, associated site, landscaping and drainage works. The existing development for retention permission consists of

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 218 m².

Planning reference SD24B/0317W

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.