Site start
Commercial site start — MILFORD
MILFORD, Donegal
1 commencement notice · start date 22 Feb 2018 · planning reference given
Planning 13/50627 · Council file · external
- Commencement notices
- 1
- Latest start date
- 22 Feb 2018
- Latest notice
- 2 units
- Planning reference
- 13/50627
- Location
- MILFORD, Donegal
Location
Where the site is
- Area
- MILFORD, Donegal
- County
- Donegal
Addresses on the notices
- FIRST FLOOR PER BUILDING TOTALLING 12 NO
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
CONSTRUCTION OF 1) 2 NO. COMMERCIAL UNITS CONSISTING OF 6 NO. GROUND FLOOR RETAIL UNITS PER BUILDING, TOTALLING 12 NO. RETAIL UNITS. 2) 6 NO.OFFICE SUITES AT FIRST FLOOR PER BUILDING TOTALLING 12 NO. OFFICE SUITES OVERALL, INCLUDING STORAGE AND STAFF FACILITIES. 3) CONNECTION INTO EXISTING PUBLIC SEWER, ASSOCIATED CARPARKING AND SITE WORKS. 4) FORM NEW ROAD ARRANGEMENT INCLUDING WIDENING THE EXISTING R245 TOGETHER WITH A RIGHT HAND TURNING LANE AND ASSOCIATED SLIP ROAD ONTO THE SITE. PHASE 1 TO CONSIST OF GROUNDWORKS, FOUNDATIONS AND BRINGING STRUCTURE OF UNITS UP TO ROOF LEVEL.
Floor area stated for this source: 4,959 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.