Site start

Housing site start — Ballina

Ballina, Mayo

1 commencement notice · start date 29 Jan 2025 · planning reference given

Planning 20518 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
29 Jan 2025
Latest notice
2 units
Planning reference
20518
Location
Ballina, Mayo

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ballina, Mayo
County
Mayo
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Mayo County Council planning record Application details, status and decision record for 20518. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Overall Development to consist of Change of Use of three storey (former) licensed premises & store into 3 no. apartments and 1 studio apartment respectively and associated site works. Conversion of existing ground floor bar and toilets into 1 no. apartment (1 bed) and refuse storage room. Conversion of existing first and second floor living accommodation/ toilets into 2 no. duplex apartments (1 bed). Conversion of existing ground floor store into 1 no. studio apartment. Development to be constructed in 2 Phases. This commencement notice will be for the conversion of existing first and second floor living accommodation/ toilets into 2 no. duplex apartments (1 bed). replacement and alterations to existing roof over proposed second floor duplex apartments. Alterations, repairs & renovations to accommodate these works.

Work stated for this notice 2 units Explicit phase quantity stated by the source.

Floor area stated for this source: 165 m².

Planning reference 20518

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.