Commencement notice group

Housing commencement notices — Cork

Cork, Cork

1 separate notice · latest notified commencement 24 Aug 2023 · planning references supplied

Source notices
1
Latest notified commencement
24 Aug 2023
Latest notice
9 units
Planning references supplied
21/40315 · 22/41405
Public location
Cork, Cork

Public source geography

Site location

Public site / locality
Cork, Cork
County
Cork

Public site labels seen across the notices

  • Middle Glanmire Road, Cork
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference21/40315
Planning reference22/41405

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0104876CY BCMS owner-supplied export

The construction of 9 no. single storey residential units and 1 no. single storey residential amenities building on the grounds of the Montenotte Hotel at Middle Glanmire Road, Cork.

9 units · 3,738 m² · stated on this notice

Planning reference 21/40315 Planning reference 22/41405 Builder stated: Rose Construction Developer stated: Montenotte Hotel Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.