Commencement notice group
Trinity Business School — commencement notices
Dublin, Dublin
1 separate notice · latest notified commencement 05 May 2026 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 05 May 2026
- Latest notice
- 232 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Trinity Business School, 182 Pearse Street, Dublin 2
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed material alterations of the existing ground floor 'Makeshop' room and existing third floor 'PHD Study' room to provide new office fit outs within the existing building at Trinity Business School, 182 Pearse Street, Dublin 2.
232 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.