Commencement notice group
Housing commencement notices — Dublin
Dublin 4, Dublin
2 unique commencement events · latest notified commencement 27 Jul 2023 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 27 Jul 2023
- Latest notice
- 561 m²
- Planning references supplied
- ABP-307267-20
- Public location
- Dublin 4, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 4, Dublin
- County
- Dublin
Public site labels seen across the notices
- Eglinton Place Dublin 4
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-307267-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Fit out of Tenant Amenity Areas to Ground Floor and 7th Floor at Eglinton Place Dublin 4. Works include installation of internal partitions, wall linings, ceilings, internal joinery & sanitary ware, all finishes and services associated with the areas, life safety systems are connected to & associated with overall building installation.
Floor area stated for this source: 561 m².
Consists of four residential blocks over a shared basement. The project involves the construction of a twelve storey building. The building consists of residential accommodation at all upper levels and a number of amenity/ancillary areas at Basement level, Ground level and 7th level including a resident’s lounge, storage areas and substation. The building consists of Block A (A1, A2 & A3), which is mostly residential apartments and amenities linked to Block B (a block of 9 duplex dwellings) via a balcony approach from Stair core 3. Block A1, A2, A3 and B will each be served by a single stair core (Stair 1, 2 and 3 respectively). All ground floor apartments, and Duplex 1 – 6 in Block A, have independent exits leading directly to the external. Duplex 7 – 9 connects to stair core 3 via balcony approach. The proposed building will consist of 148 units from ground floor to 11th floor.
Floor area stated for this source: 10,028 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.