Commencement notice group
Commercial commencement notices — Dublin
Dublin 2, Dublin
2 unique commencement events · latest notified commencement 02 Jul 2018 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 02 Jul 2018
- Latest notice
- 200 m²
- Planning references supplied
- None stated
- Public location
- Dublin 2, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 2, Dublin
- County
- Dublin
Notice location variants
- Dublin SN0002527DC
- ground and first floor level SN0002527DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The following works for floors 2 - 5 were deferred from Commencement Notice ref 8396898 and are now being undertaken as part of this Commencement Notice: 1: Raised Access Floor to ensure Part M compliance giving level access to common area in the office floor plates with associated cavity barriers and dust sealer. 2: Suspended ceilings to offices floor plate and associated cavity barriers. 3: Mechanical ventilation / air conditioning installation within office floor plates. 4: Switches, outlets and control units to ensure Part M compliance within the office floor plates. 5: Fire and Life safety systems, including emergency lighting within the office floor plates. 6: All artificial lighting throughout the office floor plates. 7: Insulation/wall completion to internal face of external fabric to ensure compliance with Part L compliance. All at 6-8 College Green, Dublin 2
Floor area stated for this source: 200 m².
The project consists of 1: change of use of existing ground and first floor commercial office, and part basement, to retail use, including 21sqm of additional floor space at ground and first floor level; 2: Elevational changes at ground and first floor level to include new retail facade to incorporate internal illuminated signage, to both College Green and Anglesea Street, and including new canopy over revised office and retail entrances; 3: Replacement of existing windows from 2nd-5th floor; 4: Revised entrances at Anglesea Street to facilitate employee, bicycle, and service access, including ESB access door; 5: Revised basement layout to include for retail storage area, bicycle parking and shower facilities 6: Replacement of existing plant at second floor external roof terrace, including proposed new screening of 2.5m high, plus replacement of existing plant at roof level at 6-8 College Green, Dublin 2
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.