Commencement notice group

Commencement notices — Mitchelstown

Mitchelstown, Cork

2 unique commencement events · latest notified commencement 10 Oct 2025 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
10 Oct 2025
Latest notice
14 m²
Planning references supplied
19/06089
Public location
Mitchelstown, Cork

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Mitchelstown, Cork
County
Cork
Location evidence needs care
  • Notice source points are up to 3.0 km apart, so no combined representative point is shown.

Source positions remain separate:

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134372CC BCMS owner-supplied export

The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of a single Compressor building.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 14 m².

Planning reference 19/06089 Builder stated: Gmc Utilities Group Ltd
CN0131153CC BCMS open-data feed

The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of the following single storey buildings: • Biomethane Network Entry Facility (BNEF) Kiosk • Electrical and Instrumentation Control Building • Package Boiler Unit (PBU) Kiosk • 2 no. Pressure Reduction Skid (PRS) Decanting Kiosks • Standby Electrical Generator Kiosk • Welfare & Control Building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 276 m².

Planning reference 19/06089

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.