Site start

Site start — Mitchelstown

Mitchelstown, Cork

2 commencement notices · latest start date 10 Oct 2025 · planning reference given

Planning 19/6089 · Planning application

Commencement notices
2
Latest start date
10 Oct 2025
Latest notice
14 m²
Planning reference
19/06089
Location
Mitchelstown, Cork

Location

Where the site is

Area
Mitchelstown, Cork
County
Cork
Location evidence needs care
  • Notice source points are up to 3.0 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 52.266213, -8.269886 Open point
  • Public notice source · 52.282936, -8.234525 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of a single Compressor building.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 14 m².

Planning reference 19/06089
Notice 2 Commencement notice

The proposed Mitchelstown Biomethane CGI is to be constructed adjacent to the existing Corracunna AGI, accessible through the N73 to Mitchelstown, Co. Cork. This Commencement Notice includes the proposed development of the following single storey buildings: • Biomethane Network Entry Facility (BNEF) Kiosk • Electrical and Instrumentation Control Building • Package Boiler Unit (PBU) Kiosk • 2 no. Pressure Reduction Skid (PRS) Decanting Kiosks • Standby Electrical Generator Kiosk • Welfare & Control Building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 276 m².

Planning reference 19/06089

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.