Site start
Housing site start — Dublin
Dublin 13, Dublin
1 commencement notice · start date 25 Mar 2020 · planning reference given
Planning 3365/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 25 Mar 2020
- Latest notice
- 132 m²
- Planning reference
- 3365/19
- Location
- Dublin 13, Dublin
Location
Where the site is
- Area
- Dublin 13, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of the following: 1. Demolition of single storey extension to side of existing dwelling house, 2. Construction for dwelling houses. Alterations to existing vehicular entrance and new vehicular entrances to access all 2 dwellings on site and all associated site development works.
Floor area stated for this source: 132 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.