Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 20 Oct 2025 · planning reference given
Planning D22A/0679 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 Oct 2025
- Latest notice
- Scale not stated
- Planning reference
- D22A/0679
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
the widening of the existing vehicular access, replacement of the existing garage flat roof with a new pitched roof to tie into the existing main roof profile, a new window to replace the existing garage doors, conversion of the existing garage to a playroom, conversion of the existing attic, a new 1st floor extension with flat roof and rooflights to the rear of the front roof slope, a new ground floor single storey extension with flat roof and rooflights to rear of the existing house, new glazing to the rear of the existing dwelling, enlargement of existing side windows and associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.