Commencement notice group
Building extension commencement notices — North Wall Quay
North Wall Quay, Dublin
1 unique commencement event · latest notified commencement 18 Jan 2016 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 18 Jan 2016
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- North Wall Quay, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- North Wall Quay, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
PROTECTED STRUCTURE: The development will consist of the repair and refurbishment of the existing external windows and external facades and will include, 1) The removal of the two existing external metal stairs to the West and North Elevation of the building. 2) General Facade Cleaning works. 3) Repair and Replacement where necessary of broken bricks and repointing of the brick facade. 4) Repair and replacement where necessary of terracotta, sandstone and granite crappings, plinths, stringers and ledges. 5) Repair and replacement where necessary of timber frames, sashes, glazing beads, cords and timber window cills and the stripping of existing degenerated paint finishes and repainting of same. 6) Removal of broken historic glazed units and replacement with Restover or similar approved drawn glass.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.