Site start
Building extension site start — North Wall Quay
North Wall Quay, Dublin
1 commencement notice · start date 18 Jan 2016 · planning reference given
Planning DSDZ3056/15
- Commencement notices
- 1
- Latest start date
- 18 Jan 2016
- Latest notice
- Scale not stated
- Planning reference
- DSDZ3056/15
- Location
- North Wall Quay, Dublin
Location
Where the site is
- Area
- North Wall Quay, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
PROTECTED STRUCTURE: The development will consist of the repair and refurbishment of the existing external windows and external facades and will include, 1) The removal of the two existing external metal stairs to the West and North Elevation of the building. 2) General Facade Cleaning works. 3) Repair and Replacement where necessary of broken bricks and repointing of the brick facade. 4) Repair and replacement where necessary of terracotta, sandstone and granite crappings, plinths, stringers and ledges. 5) Repair and replacement where necessary of timber frames, sashes, glazing beads, cords and timber window cills and the stripping of existing degenerated paint finishes and repainting of same. 6) Removal of broken historic glazed units and replacement with Restover or similar approved drawn glass.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.