Site start

Housing site start — Ballybrack

Ballybrack, Dublin

1 commencement notice · start date 10 Jul 2025 · planning reference given

Planning D23A/0079 · Planning application

View full project timeline

Commencement notices
1
Latest start date
10 Jul 2025
Latest notice
88 m²
Planning reference
D23A/0079
Location
Ballybrack, Dublin

Location

Where the site is

Area
Ballybrack, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

(1) Demolition of existing sheds and relocation of existing vehicular entrance, (2) construction of a new two storey, 2 bed single family dwelling to the side garden of No. 72 with 2no. velux to roof, offstreet parking, new vehicle entrance and associated gates, landscaping and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 88 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference D23A/0079

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.