Commencement notice group
Housing commencement notices — Prosperous
Prosperous, Kildare
1 unique commencement event · latest notified commencement 22 Feb 2022 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 22 Feb 2022
- Latest notice
- 1 house
- Planning references supplied
- 211379
- Public location
- Prosperous, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 211379 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Prosperous, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 211379. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
146 Barrington Court, Prosperous, Co Kildare. Agreed works. Alterations both internal and external to existing semi-detached dwelling a) Removal of existing glazed front porch, replacing with new red brick porch with 2 new rooflights b) Removal of existing glazed roof to bay window and replacing with new roof structure with concrete roof tiles to match existing c) Removal of part of the existing roof structure including hipped roof to rear of the single storey element and replacing with new roof structure: for covered walkway, 4 no. proposed rooflights - allowing for increased in height to the existing boundary wall d) Internal alterations to existing first floor comprising of a proposed study to new second floor with new access stairs with 2 no. proposed rooflights e) all associated site works.
Floor area stated for this source: 179 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.