Site start

Housing site start — Bandon

Bandon, Cork

1 commencement notice · start date 28 Apr 2023 · planning reference given

Planning ABP-304806-19

Commencement notices
1
Latest start date
28 Apr 2023
Latest notice
4 houses
Planning reference
ABP-304806-19
Location
Bandon, Cork

Commencement and completion records

Planning, start and completion

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Planning applications
Links to official records
0
Links between applications
Repeat copies merged
Completion certificates

Location

Where the site is

Area
Bandon, Cork
County
Cork

Addresses on the notices

  • Summerhill/Cnoc an tSamhraidh Watergate Street Bandon Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304806-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of 4 No semi Detached Dwellings No's 1-4, site entrance, connection to public mains water, connection to a public foul sewer, and all associated ancillary works, at Summerhill/Cnoc an tSamhraidh Watergate Street Bandon Co. Cork ABP reference -304806-19

Work stated for this notice 4 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 516 m².

Appeal reference ABP-304806-19

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.