Site start
Building extension site start — Athy
Athy, Kildare
1 commencement notice · start date 22 May 2017 · no planning reference given
Planning Part 8 Application
- Commencement notices
- 1
- Latest start date
- 22 May 2017
- Latest notice
- Scale not stated
- Planning references
- None given
- Location
- Athy, Kildare
Location
Where the site is
- Area
- Athy, Kildare
- County
- Kildare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
change of use of the existing St. Dominic’s Catholic Church building (a Protected Structure RPS AY 074 (NIAH Reg. No. 11505258) with a GFA of 970m2 , from use as Church to use as a Public Library. Construction of a 39m2 extension to the existing Mezzanine Level. Construction of a new level ground floor over the existing sloped ground floor. Insertion of new windows in the single storey sections of the building to south and north facades. Alterations to existing entrance steps and ramps. Site works associated with the construction of 22 car parking spaces with access control barrier, and new link road to development lands to the south. Site works associated with formation of new connections to existing public foul and surface water drainage, and existing utilities.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.