Site start
Housing site start — Naul
Naul, Dublin
1 commencement notice · start date 08 Jun 2018 · planning reference given
Planning F09A/0352/E1 · Planning application
- Commencement notices
- 1
- Latest start date
- 08 Jun 2018
- Latest notice
- 1,000 m²
- Planning reference
- F09A/0352/E1
- Location
- Naul, Dublin
Location
Where the site is
- Area
- Naul, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the construction of 2 No. 2.3 MW wind turbines of 70m hub height and 35.5m rotor radius, 1 No. 47m high wind monitoring mast (temporary structure), site access track, control house and associated ancillary works and services
Floor area stated for this source: 1,000 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.