Commencement notice group
Housing commencement notices — Rush
Rush, Dublin
1 unique commencement event · latest notified commencement 25 Sep 2025 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 25 Sep 2025
- Latest notice
- 1 house
- Planning references supplied
- F24A/0326
- Public location
- Rush, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Rush, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The Development will consist of re- design & some alterations to previously approved planning application F21B/0228. Existing pitched roof to remain and the construction of new single storey pitched roof extension to the southern side of the existing dwelling. Demolition of existing single storey flat roof extension to the east as per previous application. Alterations to new single storey pitched roof garage & tool shed to the northern boundary. The development is to include internal alterations, landscaping and all ancillary site works and drainage as required.
Floor area stated for this source: 56 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.