1 commencement notice · start date 13 Jan 2025 · planning reference given
Planning WEB1570/24 · Planning application
- Commencement notices
- 1
- Latest start date
- 13 Jan 2025
- Latest notice
- 132 m²
- Planning reference
- WEB1570/24
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of the garage to the side and the single storey extension to the rear and the construction of a two storey extension to the rear and side including the widening of the existing vehicular access to 3.6metres together with an automatic timber faced gate 1.2M high and all ancillary works.
Floor area stated for this source: 132 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.