Site start
Housing site start — Sandycove
Sandycove, Dublin
1 commencement notice · start date 28 Feb 2017 · planning reference given
Planning D16A/0802 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Feb 2017
- Latest notice
- 1 house
- Planning reference
- D16A/0802
- Location
- Sandycove, Dublin
Location
Where the site is
- Area
- Sandycove, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of the garage and chimney to the side of the existing two storey semi detached dwelling. The construction of a new two storey extension to the side, new part single storey - part two storey extension to the rear, including roof lights to the front, side and rear, with new two storey bay window to the front. Replacement of the entrance canopy to the front, alterations to the main entrance door with new side windows. Alterations to the existing first floor rear window, new entrance door to the side passage. Enlargement of the existing vehicular entrance gate off Castlepark Road. Associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.