Site start
Site start — Bandon
Bandon, Cork
4 commencement notices · latest start date 08 Dec 2020 · planning reference given
Planning 17/4106 · Planning application
- Commencement notices
- 4
- Latest start date
- 08 Dec 2020
- Latest notice
- 73 m²
- Planning reference
- 17/04106
- Location
- Bandon, Cork
Location
Where the site is
- Area
- Bandon, Cork
- County
- Cork
Addresses on the notices
- Bandon Waste Water Treatment Plant Glasslinn Road Pump Station
- Bandon Waste Water Treatment Plant
- Notice source points are up to 590 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 51.747704, -8.723353 Open point
- Public notice source · 51.747567, -8.723242 Open point
- Public notice source · 51.752047, -8.718653 Open point
- Public notice source · 51.751992, -8.718655 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Provision of new Control Building at Bandon Waste Water Treatment Plant Glasslinn Road Pump Station.
Floor area stated for this source: 73 m².
Provision of New ESB Substation and Switchroom Building at Bandon Waste Water Treatment Plant Glasslinn Road Pump Station.
Floor area stated for this source: 24 m².
Provision of new sludge building at Bandon Waste Water Treatment Plant
Floor area stated for this source: 63 m².
Provision of New ESB Substation and Switchroom Building at Bandon Waste Water Treatment Plant
Floor area stated for this source: 24 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.