Site start

Housing site start — Wexford

Wexford

1 commencement notice · start date 06 Feb 2026 · planning reference given

Planning LAC2305

Commencement notices
1
Latest start date
06 Feb 2026
Latest notice
60 units
Planning reference
LAC2305
Location
Wexford

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact reviewed project dossier for LAC2305 under Wexford County Council, retaining 1 separate commencement identities.

Commencement identities
1
retained separately
Latest group date
2026-02-06
not assigned across events
Maximum on one notice
60 units
never summed
Reviewed index
6
1 exact document links

Planning and appeal references

Every retained commencement event

  • 2026-02-06 Commencement notice 60 units on this event · 5221 m² on this event

Exact organisation roles

  • Wexford County CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Planningrecord Exact official case identity LAC2305 is indexed for this dossier. LAC2305 · 01751443.pdf · 01751443.pdf · reviewedexacttitle Open official evidence
  • Commencementevent Official commencement notice dated 2026-02-06 is retained as a separate event. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Dwellingmix Notice states 60 units for that event; it is not summed with other notices. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Floorarea Notice states 5221 m2 for that event; it is not treated as project total. Building Control commencement notice · Exact notice reference · reviewedsupported
  • Architecture The exact official file index lists "01751443.pdf". LAC2305 · 01751443.pdf · 01751443.pdf · reviewedexacttitle Open official evidence
  • Architecture The exact official file index lists "01751444.pdf". LAC2305 · 01751444.pdf · 01751444.pdf · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "01751452.pdf". LAC2305 · 01751452.pdf · 01751452.pdf · reviewedexacttitle Open official evidence
  • Otherdrawing The exact official file index lists "01751453.pdf". LAC2305 · 01751453.pdf · 01751453.pdf · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "01751472.pdf". LAC2305 · 01751472.pdf · 01751472.pdf · reviewedexacttitle Open official evidence
  • Engineeringanddrainage The exact official file index lists "01751473.pdf". LAC2305 · 01751473.pdf · 01751473.pdf · reviewedexacttitle Open official evidence

Official document index highlights

Reviewed exact official destinations and explicit index titles; this is not asserted to be the complete authority file.

Location

Where the site is

Area
Wexford
County
Wexford

Addresses on the notices

  • Killeens, Wexford, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of 60 no. residential units, comprising: a terrace of six two-storey, three-bedroom houses; twelve one-bedroom apartments and twelve two-bedroom apartments, with twelve two-bedroom duplex units and six three-bedroom duplex units located above; and twelve three-bedroom, three-storey back-to-back houses, together with all associated ancillary site development and enabling works, at Killeens, Wexford, Co. Wexford.

Work stated for this notice 60 units Explicit phase quantity stated by the source.

Floor area stated for this source: 5,221 m².

Planning reference LAC2305

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.