Site start

Housing site start — Terenure

Terenure, Dublin

1 commencement notice · start date 14 Aug 2017 · planning reference given

Planning 2539/16

Commencement notices
1
Latest start date
14 Aug 2017
Latest notice
Scale not stated
Planning reference
2539/16
Location
Terenure, Dublin

Location

Where the site is

Area
Terenure, Dublin
County
Dublin

Addresses on the notices

  • a mid-terrace two storey dwelling
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Development at a mid-terrace two storey dwelling. The development will consist of the demolition of internal partitions, stairs and rear single storey extension and construction of internal alterations, new stairs and rooflights to front and rear pitched roof, alterations to front boundary wall and yard to create new vehicular entrance gates and off street parking, new two storey extension to rear with associated landscaping and ancillary works. All for use as a single dwelling unit.

Work stated for this notice Scale not stated for this notice.
Planning reference 2539/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.