Site start
Site start — Kilcullen
Kilcullen, Kildare
1 commencement notice · start date 14 Jun 2018 · planning reference given
Planning 17/1197 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 Jun 2018
- Latest notice
- 821 m²
- Planning reference
- 17/1197
- Location
- Kilcullen, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17/1197 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Kilcullen, Kildare
- County
- Kildare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 17/1197. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of a mare barn measuring 58.4m long by 14.8m wide to the outside of the walls, with a gross floor area of 792 sq.m with an overhang of the roof of 1.5m beyond each gable with a height of 7.3m to the apex of the ridge of the roof, providing individual stalls for 20 mares and associated service rooms for grooms and veterinary stock, tack and rug rooms, provision of a wash bay and teaser box measuring 8m x 4.5m, ramped loading bay with footprint of 4.5m x 4.5m, associated hard standing area of 2160sqm around the barn buildings , 8 parking spaces, ancillary site services, drainage and access road to paddocks, provision of a septic tank and site percolation area for wc facilities for staff, soiled water tank for wash-down water, landscaping and all ancillary development, with access from the existing entrance from the R413 and internal estate agricultural roadway located at Castlemartin townland, within the farm of Castlemartin Estate, Castlemartin Demesne, protected structure, Kilcullen, Co Kildare.
Floor area stated for this source: 821 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.