Site start
Housing site start — Rush
Rush, Dublin
1 commencement notice · start date 27 Oct 2021 · planning reference given
Planning ABP-305973-19
- Commencement notices
- 1
- Latest start date
- 27 Oct 2021
- Latest notice
- 266 m²
- Planning reference
- ABP-305973-19
- Location
- Rush, Dublin
Location
Where the site is
- Area
- Rush, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305973-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
• Construction of a new detached dwelling part two storey and part single storey • New vehicular entrance opening onto South Shore Road • All associated site, boundary treatments, bin store, services, soakways, landscaping and ancillary works
Floor area stated for this source: 266 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.