Commencement notice group
Bolands Quay — commencement notices
Dublin 4, Dublin
1 unique commencement event · latest notified commencement 08 Jul 2022 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 08 Jul 2022
- Latest notice
- 27,773 m²
- Planning references supplied
- None stated
- Public location
- Dublin 4, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The material alteration and completion including the fit out of Tower 1 & Tower 2, at Bolands Quay, Dublin 4 and the construction of two new link bridges linking the two towers at 4th and 11th floor levels, and material alterations at basement levels. These works consist of: At Basement -2 level: ▪ Provision of a new waste management area and a new security office located to the South-Western end of the car park and at the bottom of the vehicular entrance ramp ▪ Sub-division of an existing refuse store room adjacent to Stair 2B such to provide 2 no. refuse store rooms ▪ Introduction of 1 no. MV rooms, 1 no. towel store rooms, 1 no. Store room, a UPS room, a grease trap room and a mesh security screen to provide security controlled access to the new rooms with same all located underneath the overhead Tower 2 ▪ Provision of new place making waste management store rooms and associated refuse store rooms to the North-Western end of the car park and change of use of an existing refuse store room to a new LV switch room adjacent to the existing generator room ▪ Introduction of a new external vendor shower and changing rooms underneath the overhead Building 1 ▪ Introduction of ancillary kitchen/catering accommodation including a number of individual store rooms and an office complete with a mesh security screen to provide security controlled access to same with the ancillary space located directly below Tower 1 ▪ Introduction of an AHU room and a grease trap room adjacent to Core 1A ▪ Introduction of 2 no. goods lifts to link basement level -2 with the upper floor offices in Towers 1 & 2 overhead and separately, introduction of a new service lift to link basement level -2 with the external site grounds/podium which will open out to the external of Tower 2 on its North Elevation (with no internal access from the ground floor Unit T2) ▪ Reduction in the number of car parking spaces on basement -2 from 80 to 27 to accommodate the above proposed works whilst there will be a to
Floor area stated for this source: 27,773 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.