Commencement notice group

Building extension commencement notices — Bray

Bray, Wicklow

1 unique commencement event · latest notified commencement 16 Jun 2021 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
16 Jun 2021
Latest notice
150 m²
Planning references supplied
18/1431
Public location
Bray, Wicklow

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Bray, Wicklow
County
Wicklow
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Wicklow County Council planning record Application details, status and decision record for 18/1431. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Demolition of existing single storey shed along party boundary to rear; Demolition of existing single storey garage to side; Construction of two storey extension to side with non- habitable attic accommodation, single storey extension to the front and single storey extension to the rear including rooflight; Application of external wall insulation to existing walls; All associated internal alterations, site, landscaping and drainage works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 150 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference 18/1431

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.