Site start
Building extension site start — Malahide
Malahide, Dublin
1 commencement notice · start date 14 Oct 2024 · planning reference given
Planning F24A/0525 · Planning application
- Commencement notices
- 1 1 repeat copy merged
- Latest start date
- 14 Oct 2024
- Latest notice
- Scale not stated
- Planning reference
- F24A/0525
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level, c) new rooflights to existing to existing roof, and all associated site works
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.
a) the removal of existing front weather porch, with altered hipped roof and new louvred partition, b) alterations to fenestration at ground floor level, c) new rooflights to existing to existing roof, and all associated site works.
- Historical commencement notice Notified commencement: 2024-10-14 Source checked: 2026-11-19T03:04:42Z Open source record
- Commencement notice (owner-supplied) Notified commencement: 2024-10-14 Source checked: 2026-06-09T15:11:14Z Open source record
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.