Commencement notice group

Secondary school — commencement notices

Tramore, Waterford

1 separate notice · latest notified commencement 11 Apr 2019 · planning reference supplied

Source notices
1
Latest notified commencement
11 Apr 2019
Latest notice
2,277 m²
Planning references supplied
17/395
Public location
Tramore, Waterford

Public source geography

Site location

Public site / locality
Tramore, Waterford
County
Waterford

Public site labels seen across the notices

  • Ardscoil na Mara, Tramore, Co Waterford
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference17/395

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0050398WD BCMS open-data feed

Development to consist of a three storey extension and material alterations (addition of first floor mezzanine including access and escape stairs) to existing Secondary school at Ardscoil na Mara, Tramore, Co Waterford

2,277 m² · stated on this notice

Planning reference 17/395

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.