Site start

Demolition of existing extensions at ground floor to rear

Dublin 12, Dublin

1 commencement notice · start date 30 Nov 2026 · no planning reference given

Commencement notices
1
Latest start date
30 Nov 2026
Latest notice
157 m²
Planning references
None given
Location
Dublin 12, Dublin

Location

Where the site is

Area
Dublin 12, Dublin
County
Dublin

Addresses on the notices

  • ground floor to rear (39
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Demolition of existing extensions at ground floor to rear (39.5 sqm in total) and construction of a 36 sqm single storey extension to rear at ground floor. Removal of existing chimney and end wall of return at first floor level and construction of a 7.1 sqm pitched roof extension to rear at first floor and all associated internal and external alterations

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 157 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.