Site start
Site start — Blanchardstown
Blanchardstown, Dublin 15, Dublin
1 commencement notice · start date 23 Mar 2015 · planning references given
Planning FW09A/0061&FW14A/0088
- Commencement notices
- 1
- Latest start date
- 23 Mar 2015
- Latest notice
- Scale not stated
- Planning references
- FW09A/0061 · FW14A/0088
- Location
- National Sports Campus, Blanchardstown, Dublin 15
Location
Where the site is
- Area
- Blanchardstown, Dublin 15, Dublin
- County
- Dublin
Addresses on the notices
- National Sports Campus, Blanchardstown, Dublin 15
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The National Indoor Arena Development constitutes the “Main Core building” of the National Sports Campus Training facilities. The signature structure ranges in height from 12m-17m. This Building incorporates Internal Blocks (A, B, C & D) comprising; (A) National Gymnastics training centre with hall, changing rooms, viewing gallery, press offices and ancillary offices, national indoor athletics training centre with 6 lane 200m and 110m sprint track , in-field event area, fixed seating for 400 spectators; changing rooms, stores administration: (B) National Indoor training centre with bleacher seating for 1600 spectators, changing rooms, café for 120 patrons, kitchen facilities, stores, athletics fitness and conditioning centre and building energy centre; (C) Sports science and medical centre with reception, offices, consultation rooms, treatment rooms, laboratories and service rooms, rugby training facilities consisting of covered synthetic floodlit (500 Lux) Half pitch and 6 lane sprint briefing rooms, offices toilets and stores; (D) Soccer training facilities consisting of covered synthetic floodlit (500 Lux) full pitch, reception, changing rooms, briefing room, offices, toilets, staff room, meeting rooms and rehabilitation gym with multi-purpose room, community (National Sports campus development authority) (NSCDA) outdoor sports changing facility with changing rooms, showers and toilets; 3 No sub-stations within the building envelope; and parking for 300 cars and bicycle parking. Immediate Landscaping, Engineering Works and the construction of the new Building as detailed above.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.