Site start
Building extension site start — Dublin
Dublin 6, Dublin
1 commencement notice · start date 10 Aug 2026 · planning reference given
Planning WEB5561/25 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 10 Aug 2026
- Latest notice
- 277 m²
- Planning reference
- WEB5561/25
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: (i) the proposed demolition of a non-original front two-storey porch structure; (ii) the proposed demolition of the rear 2-storey return and side shed structure; (iii) the proposed construction of a part single, part two-storey front and side extension; (iv) the proposed construction of a part single, part two-storey rear extension with enclosed private rooftop terrace; (v) the provision of a 2 no. parking spaces and bin storage structure to the front of the dwelling; (vi) the provision of a new front boundary wall with proposed vehicular and pedestrian gates; and (vii) permission is also sought for all associated site and infrastructural works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development.
Floor area stated for this source: 277 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.