Site start

4th FLOOR, Custom House Plaza, Harbourmaster Place, I.F.S.C, Dublin 1

Dublin 1., Dublin

1 commencement notice · start date 04 Nov 2024 · no planning reference given

Commencement notices
1
Latest start date
04 Nov 2024
Latest notice
385 m²
Planning references
None given
Location
4th FLOOR, Plaza 5, Custom House Plaza, Harbourmaster Place, I.F.S.C, Dublin 1

Location

Where the site is

Area
Dublin 1., Dublin
County
Dublin

Addresses on the notices

  • 4th FLOOR, Plaza 5, Custom House Plaza, Harbourmaster Place, I.F.S.C, Dublin 1
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Office Fitout to existing 4th floor plaza 5 office space to include strip out. Electrical and mechanical alterations to include sanitary ware to suit new layouts, fire proofing, alterations to ceilings, Joinery items (Vanity Units), Stud/Glazed Partitions, Painting & Decoration.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 385 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.