Commencement notice group
Devoy Quarter — commencement notices
Naas, Kildare
12 separate notices · latest notified commencement 09 Dec 2022 · planning reference supplied
- Source notices
- 12
- Latest notified commencement
- 09 Dec 2022
- Latest notice
- 20 m²
- Planning references supplied
- ABP-311825-21
- Public location
- Naas, Kildare
Public source geography
Site location
- Public site / locality
- Naas, Kildare
- County
- Kildare
Public site labels seen across the notices
- Devoy Quarter, Naas West, Naas, Co
- Devoy Quarter Naas West Co
- Devoy Quarter, Naas West, Co
- ground floor and 2no
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 21: Construction of Bin Store D at Devoy Quarter, Naas West, Naas, Co. Kildare
20 m² · stated on this notice
Phase 24: Construction of bin store A at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m² · stated on this notice
Phase 23: Construction of bin store B at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m² · stated on this notice
Phase 22: Construction of bin store C at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m² · stated on this notice
Phase 20: Construction of bin store E at Devoy Quarter, Naas West, Naas, Co. Kildare
18 m² · stated on this notice
Phase 19: Construction of bin store F & G at Devoy Quarter, Naas West, Naas, Co. Kildare
37 m² · stated on this notice
Phase 18: Block 3: Construction of 8no additional units bringing total to 30no. units at Devoy Quarter Naas West Co. Kildare
8 units · 2,059 m² · stated on this notice
Phase 17: Block 9: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
2 units · 1,078 m² · stated on this notice
Phase 16: Block 8: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
2 units · 1,079 m² · stated on this notice
Block 4 Construction of 4no. additional units bringing total to 24no. units at Devoy Quarter, Naas West, Co. Kildare
4 units · 629 m² · stated on this notice
Construction of mixed use building with a crèche at ground floor and 2no. apartments above creche at Devoy Quarter, Naas West, Naas, County Kildare
2 units · 349 m² · stated on this notice
Block 7 ground floor internal layout change for 1no. additional unit to previous approved Ref 8460049 bringing total to 20no. units at Devoy Quarter, Naas West, Co. Kildare
171 units · 1,923 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.