Commencement notice group
Devoy Quarter — commencement notices
Naas, Kildare
12 unique commencement events · latest notified commencement 09 Dec 2022 · planning reference supplied
- Unique commencement events
- 12
- Latest notified commencement
- 09 Dec 2022
- Latest notice
- 20 m²
- Planning references supplied
- ABP-311825-21
- Public location
- Naas, Kildare
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Naas, Kildare
- County
- Kildare
Notice location variants
- Devoy Quarter, Naas West, Naas, Co SN0007968KE, SN0007870KE, SN0007869KE, SN0007868KE, SN0007867KE, SN0007896KE
- Devoy Quarter Naas West Co SN0007770KE, SN0007769KE, SN0007768KE
- Devoy Quarter, Naas West, Co SN0007648KE, CN0091855KE
- ground floor and 2no SN0007568KE
- Notice source points are up to 68.4 km apart, so no combined representative point is shown.
Source positions remain separate:
- SN0007968KE · 53.212735, -6.672432 Open point
- SN0007870KE · 53.212748, -6.672379 Open point
- SN0007869KE · 53.212723, -6.672379 Open point
- SN0007868KE · 53.212857, -6.672422 Open point
- SN0007867KE · 53.212720, -6.672476 Open point
- SN0007896KE · 53.212735, -6.672518 Open point
- SN0007770KE · 53.212772, -6.672685 Open point
- SN0007769KE · 53.212832, -6.672680 Open point
- SN0007768KE · 53.212827, -6.672563 Open point
- SN0007648KE · 53.212131, -6.671649 Open point
- SN0007568KE · 53.142367, -7.692054 Open point
- CN0091855KE · 53.211393, -6.672711 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-311825-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 21: Construction of Bin Store D at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 20 m².
Phase 24: Construction of bin store A at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 18 m².
Phase 23: Construction of bin store B at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 18 m².
Phase 22: Construction of bin store C at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 18 m².
Phase 20: Construction of bin store E at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 18 m².
Phase 19: Construction of bin store F & G at Devoy Quarter, Naas West, Naas, Co. Kildare
Floor area stated for this source: 37 m².
Phase 18: Block 3: Construction of 8no additional units bringing total to 30no. units at Devoy Quarter Naas West Co. Kildare
Floor area stated for this source: 2,059 m².
Phase 17: Block 9: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
Floor area stated for this source: 1,078 m².
Phase 16: Block 8: Construction of 2no additional units bringing total to 14no. units at Devoy Quarter Naas West Co. Kildare
Floor area stated for this source: 1,079 m².
Block 4 Construction of 4no. additional units bringing total to 24no. units at Devoy Quarter, Naas West, Co. Kildare
Floor area stated for this source: 629 m².
Construction of mixed use building with a crèche at ground floor and 2no. apartments above creche at Devoy Quarter, Naas West, Naas, County Kildare
Floor area stated for this source: 349 m².
Block 7 ground floor internal layout change for 1no. additional unit to previous approved Ref 8460049 bringing total to 20no. units at Devoy Quarter, Naas West, Co. Kildare
Floor area stated for this source: 1,923 m².
Source unit value with scope not stated: 171 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.