Commencement notice group

Building extension commencement notices — Sligo

Sligo, Sligo

1 separate notice · latest notified commencement 16 Jul 2018 · planning reference supplied

Source notices
1
Latest notified commencement
16 Jul 2018
Latest notice
Scale not stated
Planning references supplied
PL17/295
Public location
Sligo, Sligo

Public source geography

Site location

Public site / locality
Sligo, Sligo
County
Sligo

Public site labels seen across the notices

  • library
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Appeal referencePL17/295

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0041279SO BCMS owner-supplied export

Various minor works throughout IT Sligo & the creation of New Bus Shelters and associated laybys Minor works include: • Upgrading of Light Fittings to LED • Energy Upgrades to heat plant, A/C Units and HWS Cylinders. • Internal redecoration • External redecoration • Renovate stairs in Knocknarea Arena • Refurbishment ClassroomF1020 • Overlay and refurbish footpath around strea • Removal of Fastlane Glasswing access gates at library. • Modification and extensions to the toolroom creating a new computer lab in Room F0013. • Modification to Engineering Management Suite in Block E • Create new entrance to the SEC/Controller Area • Upgrade of toilet facility in IT Services • Creation of 6no. on-line booths in existing prefab offices. • Works to existing chemical store.

Scale not stated on this notice

Appeal reference PL17/295 Builder stated: Kilcawley Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.