Commencement notice group
Housing commencement notices — Hansfield
Hansfield, Dublin
2 unique commencement events · latest notified commencement 27 Feb 2020 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 27 Feb 2020
- Latest notice
- 276 m²
- Planning references supplied
- FW18A/0197
- Public location
- Hansfield, Dublin
Public source geography
Site location
- Public site / locality
- Hansfield, Dublin
- County
- Dublin
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of one 2-storey detached creche building of masonry construction and tiled pitched roof.
Floor area stated for this source: 276 m².
At 1-18, 33-98 & 101-109 Barnwell Park & 42-54 Station Road, the construction of 106 no. houses in detached, semi-detached and terraced form. 1 no. is 3-storey, while 105 no. are 2-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
Floor area stated for this source: 11,695 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.