Site start
Housing site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 21 Jul 2015 · planning reference given
Planning 3224/14
- Commencement notices
- 1
- Latest start date
- 21 Jul 2015
- Latest notice
- 1 house
- Planning reference
- 3224/14
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
Addresses on the notices
- 2nd floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
works to residential dwelling. Demolition existing rear wall to 1st floor and roof structure above, at 2nd floor level. Construction of a new rear extension to 1st floor level of 12.3 sq.m frameless glazed, -7.26 sq.m extension with two new windows and rendered walls to 2nd floor level with new roof profile to tie into existing front ridge line, -new drainage to tie into existing connections and all associated works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.