Commencement notice group
Commercial commencement notices — Dublin
Dublin 7, Dublin
2 unique commencement events · latest notified commencement 15 Feb 2018 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 15 Feb 2018
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Dublin 7, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 7, Dublin
- County
- Dublin
Notice location variants
- Dublin, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of a new student accommodation block at 25-29, Dominic St Upper, Dublin 7. The building is designed between 3-5 stories in height, over part basement.
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
The scope of works includes the complete demolition and carting away of the existing building structure on site. The building consists of a 2 storey brick clad structure to the front with an industrial single storey structure to the rear. The existing building is to be demolished to ground level with existing foundations removed.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.