Commencement notice group

Building extension commencement notices — Dublin

Dublin 4, Dublin

1 unique commencement event · latest notified commencement 04 Apr 2018 · planning basis not stated

Unique commencement events
1
Latest notified commencement
04 Apr 2018
Latest notice
1 house
Planning references supplied
None stated
Public location
Dublin 4, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 4, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0037352DC BCMS open-data feed

demolition of non-original plant room structure; construction of a single storey extension (18.5m2) to the rear; new kitchen fittings, alterations to non-original finishes to the lower ground floor level generally; repair of lime plaster and decorative plaster, new floor finishes, and alterations to non-original finishes to the Upper ground floor level, removal of non-original internal partitions and bathrooms fittings and replacement with new internal partitions and bathroom fittings, new built in fittings to the first floor level; replacement of non-original stairs, new shower room and new partitions to ground and first floor. Internal works to coach house; Breathable woodfibre and lime plaster to coach house internal face of external walls; Open up coach house openings to original size; Repair of timber sash windows; Repair of original joinery; Re-pointing of brick facade and chimneys with lime mortar to Wellington Road; Roofing including re-slating of main house and coach house on a breathable membrane re-using existing natural slate and replacements, where required to match existing on a like-for-like basis; Upgrading of mechanical and electrical services to main house and coach house; Redecoration of house on completion and landscaping to the front and rear and associated site works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 465 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.