Commencement notice group
Building extension commencement notices — Dublin
Dublin 4, Dublin
1 unique commencement event · latest notified commencement 04 Apr 2018 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 04 Apr 2018
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Dublin 4, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
demolition of non-original plant room structure; construction of a single storey extension (18.5m2) to the rear; new kitchen fittings, alterations to non-original finishes to the lower ground floor level generally; repair of lime plaster and decorative plaster, new floor finishes, and alterations to non-original finishes to the Upper ground floor level, removal of non-original internal partitions and bathrooms fittings and replacement with new internal partitions and bathroom fittings, new built in fittings to the first floor level; replacement of non-original stairs, new shower room and new partitions to ground and first floor. Internal works to coach house; Breathable woodfibre and lime plaster to coach house internal face of external walls; Open up coach house openings to original size; Repair of timber sash windows; Repair of original joinery; Re-pointing of brick facade and chimneys with lime mortar to Wellington Road; Roofing including re-slating of main house and coach house on a breathable membrane re-using existing natural slate and replacements, where required to match existing on a like-for-like basis; Upgrading of mechanical and electrical services to main house and coach house; Redecoration of house on completion and landscaping to the front and rear and associated site works.
Floor area stated for this source: 465 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.