Commencement notice group

Commencement notices — Kill

Kill, Kildare

1 separate notice · latest notified commencement 05 Dec 2024 · planning reference supplied

Source notices
1
Latest notified commencement
05 Dec 2024
Latest notice
339 m²
Planning references supplied
23992
Public location
Kill, Kildare

Public source geography

Site location

Public site / locality
Kill, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Kildare County Council · reference 23992 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference23992

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0122633KE BCMS owner-supplied export

Alterations and modifications to existing single storey offices to provide for 3 no. own door offices with attic conversions, dormer windows to front, new pitched roof to match existing over existing yard/boiler & store area containing mezzanine storage area over with dormer to fro

339 m² · stated on this notice

Planning reference 23992 Builder stated: Horizon Future Enterprises Ltd Developer stated: Horizon Future Enterprises Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.