Site start
Building extension site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 24 Feb 2021 · planning reference given
Planning 4320/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 24 Feb 2021
- Latest notice
- Scale not stated
- Planning reference
- 4320/19
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Replace existing rear extension with larger 2 storey extension to rear extending to side at ground floor, replacing front porch with glass porch, new roof light over stairwell on front roof slope and widening of existing footpath dishing to existing vehicular access with connection to all services and associated works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.