Commencement notice group

Building extension commencement notices — Grange

Grange, Sligo

1 unique commencement event · latest notified commencement 29 Feb 2024 · planning reference supplied

Unique commencement events
1
Latest notified commencement
29 Feb 2024
Latest notice
1 unit
Planning references supplied
PL23/60089
Public location
Grange, Sligo

Public source geography

Site location

Public site / locality
Grange, Sligo
County
Sligo
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0110547SO BCMS open-data feed

The construction of a single storey extension to the front (south west) elevation, 2.) The construction of a single storey extension to the side (south east) elevation, 3.) a replacement proprietary effluent treatment system and all associated site works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 54 m².

Appeal reference PL23/60089

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.