Site start

Housing site start — Celbridge

Celbridge, Kildare

1 commencement notice · start date 09 May 2019 · planning reference given

Planning 18943 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
09 May 2019
Latest notice
1 house
Planning reference
18943
Location
Celbridge, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Exact appeal 303222 · Grant permission with revised conditions · 2019-04-15 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Celbridge, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 18943. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of; a) The demolition of an existing shed, making way for a new rear single storey ground floor extension, with skylights in the roof, accommodating a new open plan kitchen, dining and family area. b) Internal alterations including; installing a ground floor WC, using the attic space as a walk in wardrobe for the master bedroom. Existing roof of house to have two new skylights to the rear. c) Enlarging the side access gate to the rear garden to a larger opening, and all associated works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 132 m².

Planning reference 18943

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.