Commencement notice group
Housing commencement notices — Douglas
Douglas, Cork, Cork
13 unique commencement events · latest notified commencement 27 Sep 2024 · planning reference supplied
- Unique commencement events
- 13
- Latest notified commencement
- 27 Sep 2024
- Latest notice
- 58 houses
- Planning references supplied
- ABP-304367-19
- Public location
- Douglas, Cork, Cork
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Douglas, Cork, Cork
- County
- Cork
Notice location variants
- Douglas, Cork CN0120024CY, CN0110821CY, CN0108131CY
- Notice source points are up to 728 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0120024CY · 51.863273, -8.430725 Open point
- SN0010158CY · 51.865221, -8.423589 Open point
- SN0010156CY · 51.864893, -8.423274 Open point
- SN0010132CY · 51.865544, -8.424157 Open point
- CN0108131CY · 51.863865, -8.422136 Open point
- CN0108116CY · 51.864480, -8.424824 Open point
- CN0095578CY · 51.864315, -8.429364 Open point
- CN0092401CY · 51.865159, -8.432535 Open point
- CN0092092CY · 51.864534, -8.432163 Open point
- CN0091579CY · 51.865435, -8.427131 Open point
- CN0090011CY · 51.865630, -8.427851 Open point
- CN0088509CY · 51.864737, -8.428604 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304367-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 58no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-30 Bayly Close, 1-12 Bayly Way, 14-25 Bayly Way & 5-8 Bayly Court
Floor area stated for this source: 7,340 m².
Construction of 24no. apartments over 4no. stories with a shared part basement carpark, bicycle storage and/plant service areas
Floor area stated for this source: 3,118 m².
Construction of 44no. apartments over 5no. stories with a shared part basement carpark, bicycle storage and general services/plant areas
Floor area stated for this source: 3,520 m².
Construction of 5no. storey building comprising 30no. apartments
Floor area stated for this source: 2,495 m².
Construction of 58no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-30 Bayly Close, 1-12 Bayly Way, 14-25 Bayly Way & 5-8 Bayly Court
Source unit value with scope not stated: 58 houses. It is not presented as notice-specific scale.
Construction of 119no. dwelling units & associate site works. This commencement notice covers dwellings No. 13 & 26-58 Bayly Way, 1-4 & 9-11 Bayly Court, 1-31 Bayly Avenue, 1-21 Bayly Drive, 1-26 Bayly Heights, Bayly, Douglas
Floor area stated for this source: 14,362 m².
Construction of 8no. dwelling units and associated site works. This commencement notice covers dwellings No. 1-8 Bayly Hill, Douglas, Cork.
Floor area stated for this source: 1,125 m².
Construction of 16no. dwelling units and associated site works. This commencement notice covers dwellings No. 9-16 Bayly Hill, Douglas, Cork.
Floor area stated for this source: 1,129 m².
Source unit value with scope not stated: 238 houses. It is not presented as notice-specific scale.
Construction of a 5no. storey building comprising of 47no. apartments
Floor area stated for this source: 3,451 m².
Source unit value with scope not stated: 238 units. It is not presented as notice-specific scale.
Construction of 30no. residential units over 3no. floors comprising flats & maisonettes
Floor area stated for this source: 3,087 m².
Construction of a two-storey childcare facility comprising of lower ground floor and ground floor levels
Floor area stated for this source: 650 m².
Construction of 23no. residential units over 3no. floors comprising flats and maisonettes
Floor area stated for this source: 2,185 m².
Source unit value with scope not stated: 238 units. It is not presented as notice-specific scale.
Construction of 41no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-41 Woodland Drive, Bayly, Douglas
Floor area stated for this source: 5,034 m².
Source unit value with scope not stated: 238 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.