Site start

Site start — Dublin

Dublin 2, Dublin

2 commencement notices · latest start date 11 Apr 2024 · planning reference given

Planning 4675/23 · Planning application

View full project timeline

Commencement notices
2
Latest start date
11 Apr 2024
Latest notice
833 m²
Planning reference
4675/23
Location
60-63 Dawson Street, Dublin 2

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin

Addresses on the notices

  • 60-63 Dawson Street, Dublin 2
  • Junction of Dawson and Nassau Street, Dublin 2
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Proposed material alteration and change of use from shop to assembly and recreation at Unit 3A, 60-63 Dawson Street (Grafton Place), Dublin 2, formerly known as Unit 6 Ground floor and Unit 3 basement, Grafton Place, Dublin 2

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 833 m².

Planning reference 4675/23
Notice 2 Seven-day notice

[Fire Safety Certificate application for] the Proposed Partial Change of Use, Subdivision and Material Alterations at Basement & Ground floor of the Mixed Use Development known as Project Kells at the junction of Dawson and Nassau Street, Dublin 2. The works include the construction of blockwork demise walls, stairs & lift installation, mechanical and electrical alteration works and modifications to the existing shopfronts.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,023 m².

Planning reference 4675/23

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.