Site start
Commercial site start — Dublin
Dublin 8, Dublin
2 commencement notices · latest start date 04 Dec 2017 · planning reference given
Planning 4337/16
- Commencement notices
- 2
- Latest start date
- 04 Dec 2017
- Latest notice
- Scale not stated
- Planning reference
- 4337/16
- Location
- Dublin 8, Dublin
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- a future date
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development of a 0.3 ha site, approximately. The development will consist of the provision of a new hotel building consisting of basement (2,012 sq.m) ground floor (2,054 sq.m) with five floors of bedrooms above the ground floor (with 3 metre set back on the fifth bedroom floor). The proposed hotel will comprise 234 no. bedrooms and related uses including café/ bar/ restaurant (413 sq.m) and meeting/ conference facilities (397 sq.m) with a gross floor area of 10,779 sq.m over basement. The parapet height of the proposed development is 17.75 m. The development will also include: the provision of a new vehicular access to the site from The Coombe; the provision of 23 no. ancillary car parking spaces; bicycle parking; ancillary circulation, staff and administration areas; plant; all hard and soft landscaping; boundary treatments; the retention and repair of the existing chimney breast remnant on the eastern boundary of the site adjoining Fallon's public house (a Protected Structure); attenuation measures including holding tank; waste storage areas; piped infrastructure and ducting; signage; changes in level and all associated site development and site excavation works above and below ground.
This Short Form Commencement Notice for a new Hotel Development 118-128 The Coombe, Dublin 8 relates to enabling works only, which includes demolition of existing structures, site clearance and excavation for level formation. No permanent development will be undertaken under this short form commencement notice. The material alteration works are subject to a FSC and as such these works will be covered under a separate Commencement Notice with Documentation at a future date.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.