Commencement notice group
Commercial commencement notices — Newbridge
Newbridge, Kildare
2 unique commencement events · latest notified commencement 15 Jul 2022 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 15 Jul 2022
- Latest notice
- 753 m²
- Planning references supplied
- 21/1780
- Public location
- Newbridge, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 2
- Open exact official planning record: 21/1780 Kildare County Council
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-07 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-07 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Newbridge, Kildare
- County
- Kildare
- Notice source points are up to 543 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.178016, -6.777408 Open point
- Public notice source · 53.182234, -6.773303 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 21/1780. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. It is proposed to demolish 4 no. existing buildings and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road and boundary wall and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing acoustic timber fence. It is proposed to provide additional car parking and bike parking spaces. 1 no. sign is proposed on the Steel Fabrication building, and 2 no. on the Pipe Ancillary Building. The existing yard will be extended and these and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed.
Floor area stated for this source: 753 m².
The development will consist two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. It is proposed to demolish 4 no. existing buildings and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road and boundary wall and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing acoustic timber fence. It is proposed to provide additional car parking and bike parking spaces. 1 no. sign is proposed on the Steel Fabrication building, and 2 no. on the Pipe Ancillary Building. The existing yard will be extended and these and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed.
Floor area stated for this source: 2,532 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.