Site start
Site start — Dublin Airport
Dublin Airport, Dublin
2 commencement notices · latest start date 17 Mar 2026 · planning reference given
Planning F23A/0786 · Planning application
- Commencement notices
- 2
- Latest start date
- 17 Mar 2026
- Latest notice
- 1,910 m²
- Planning reference
- F23A/0786
- Location
- Dublin Airport, Dublin
Location
Where the site is
- Area
- Dublin Airport, Dublin
- County
- Dublin
Addresses on the notices
- Dublin Airport
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed construction of the North Apron Line Maintainence Centre (NALMC) building to be located in the North Apron area airside at Dublin Airport
Floor area stated for this source: 1,910 m².
Proposed construction of the North Apron Airside Support (NAAS) buildings to be located in the North Apron area airside at Dublin Airport
Floor area stated for this source: 1,717 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.